Specification and design Energy conservation Fire performance Insurance
 
EPIC Logo
Search site
Home
News
Topics of interest
EPIC members
Links to other sites
Order guides online

Case histories
IP Europe
Shanles Pine
Erdington
Gala
Wharfdale Hospital

new EPIC e-bulletin. Click here to register.

Contact EPIC
29 High Street
Ewell
Surrey KT17 1SB
Tel +44 (0)20 8786 3619
Fax +44 (0)20 8786 8887
Email
info@epic.uk.com

All content © 2004 EPIC.
All rights reserved.

 

Erdington Leisure (July 2003)

Location: Leisure Complex, Erdington, West Midlands

Building construction
External walls were constructed using standard PUR insulated horizontal wall panels (picture 1) The storeroom in which the fire occurred was located adjacent to external wall and was constructed with block work walls to 2.5 metres high with a false ceiling.

Picture 1.

Fire
The fire took place in the storeroom. The storeroom contained a high fire load and the intensity of the fire is indicated by the damage to the fire resisting wooden door frame (picture 2).

Picture 2.

The fire broke out of the storeroom resulting in direct flame impingement on the adjacent panels.

Observations
Charring was visible at the joints where there had been direct impingement (picture 3).
Although the metal purlins above the seat of the fire were distorted, the panel joints did not open up and there was no evidence of ignition or fire spread.
 